Investment opportunity · Ovča, Belgrade

Thermal & mineral water, twelve kilometres from Belgrade

A luxury sports, recreation, rehabilitation and tourism SPA & Wellness centre, built on the club’s own thermal mineral well and geothermal energy.

12km

to Belgrade city centre

250km

radius with no comparable facility

4.5M

potential users in the catchment area

6.5ha

in three building zones

100M€

estimated total investment

The opportunity

A spa resort on land and water rights that already exist

FK “City Sport Club” has invested in the Ovča site since 2000. It holds the land, the right to extract the thermal mineral water, and an in-house feasibility study on using the water and geothermal energy commercially.

Planning in place

A detailed regulation plan, “banja u Ovči”, covers the site.

Built in stages

Each stage is designed to be profitable on its own and to fund the next.

Land as collateral

The value of the fully serviced building land is close to the value of the whole investment.

The resource

Water left behind by the Pannonian Sea

23°C
Source

An abundant, protected groundwater resource the club describes as inexhaustible.

Minerals

Salty and highly mineralised, with a composition close to human blood plasma.

Geothermal

Heat pumps designed to heat and cool 100,000 m² of the centre.

Air

The local air meets the parameters of an air spa.

DANUBE SAVA PUPIN BRIDGE PANČEVO BRIDGE Belgrade centre AIRPORT EXPO 2027 · NATIONAL STADIUM PANČEVO Ovča LEFT BANK · RAILWAY STATION 12 km SCHEMATIC · NOT TO SCALE
Location

On the left bank, opposite EXPO 2027

Ovča has its own railway station and connects to the city over the Pupin and Pančevo bridges. EXPO 2027 and the National Stadium are being built across the Danube.

Belgrade city centre
12 km
E-75 / E-70 junction
15 km
Nikola Tesla Airport
20 km
Pančevo
12 km
The site · 6.5 ha

Three zones, one centre

Drone photo of the site in Ovča with the club's football pitch, an adjacent plot, a large ploughed field and strip fields
Concept illustration

Additional land can be purchased next to the site.

Estimated total investment
100M€
SP1 15SP2 40SP3 10Remaining 35
Schedule

From permits to opening

2027

Building permits by the end of the year

18–24 mo

Construction from the date permits are issued

2029

Expected completion

≤ 4 yrs

Payback after opening, by stage

Goals of the current investment phase
  1. Buy the remaining privately and publicly owned land
  2. Make each stage profitable both on its own and as part of the whole
  3. Create the conditions for further investment in the complete centre
  4. Launch the centre’s first planned functions
Already on site

A working pitch, and the infrastructure to grow from

The club’s football pitch has an irrigated natural lawn and basic supporting facilities. Stage one builds on what is already there.

The pitch with sprinklers running, June 2022
Irrigation in use · June 2022
The mown pitch with goal and dugout, June 2025
The pitch today · June 2025
Next step

Request a meeting

Serious investors receive the full project materials after signing an NDA.

Shared under NDA
  • In-house feasibility study on the thermal water and geothermal energy
  • Cadastral plan of zones SP1, SP2 and SP3
  • Detailed regulation plan “banja u Ovči”
  • Stage-by-stage investment estimates